M&E installation on iconic university building

March worked as part of the team to deliver the mechanical & electrical installation of the iconic INTO Building at a leading university.

Solution

March was tasked with delivering a full Mechanical and Electrical installation throughout the INTO building. The work included:

• Integration of district LTHW into the new buildings distribution systems
• Domestic hot and cold water distribution from plant room to outlets
• AHU’s located throughout the building serving areas with temperature-controlled air.
• Fitting of extractor fans located throughout the building
• Full installation, commission and integration of the university’s site-wide communication system
• A/C installation to the Comms room
• Test and commission the mechanical services
• Full electrical fit-out for all lighting throughout the building
• Full installation of power outlets throughout the building
• Wiring for the state of the art full-screen interactive lecturers board system & integrated projectors for each classroom.

Case Studies

Asset engineering services for the UK’s best loved cereal brands

Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.

Read more

Cloud Technology Deployment for a Major Utilities Company

When our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.

Read more

Systems Integration & Automation for leading food and beverage manufacturer

March has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.

Read more

Hybrid facilities management for global food brand

“The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”

Read more

14% planned production increase per month

March manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.

Read more

+£28m of M&E services for defence organisation

March provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)

Read more

Asset care maintenance for global chemical manufacturer

March undertake significant 24 hour asset care for their client, a leading multi billion pound manufacturing company.

Read more

MEP for a global aerospace company

March was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.

Read more