Reliability improvement saving £425,000

March undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.

History

The steel belt is one of the client’s most critical assets. It transports raw material into storage at a rate of around 400 tonnes per hour. After a critical failure in 2016, failure data analysis showed that the belt had a mean time between failure of 9 months.

Solution

March undertook a reliability improvement project on the steel belt to rectify the failures.

Analysis indicated that the common failure mode was a joint failure, which at the time was a riveted joint. After consultation with the manufacturer, March implemented a welded joint to improve the reliability of this common failure mode. The analysis also indicated that the belt was subject to persistent tracking issues. To rectify this the March team designed tracking rollers which pivot when the belt tracks over.

A change in the roller position is initiated by an elasto-mounted tracking roller on the frame, manufacturing the roller from brass ensured that the roller would be the wearable part as opposed to the belt’s edge. In addition the team added spring mounted brass rollers which would constantly apply light pressure to the belts edge to align it centrally.

The redesign meant March had to re-assess the current maintenance regime, which led to the implementation of on-condition tasks for the new rollers and an NDT test on the welded steel joint.

Results

The steel belt is still in use today which means an improvement in reliability from 9 months to a minimum of 4 years.

The cost of a new belt was £80,000, making the cost saving for the client roughly £425,000.

Case Studies

Asset engineering services for the UK’s best loved cereal brands

Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.

Read more

Cloud Technology Deployment for a Major Utilities Company

When our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.

Read more

Systems Integration & Automation for leading food and beverage manufacturer

March has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.

Read more

Hybrid facilities management for global food brand

“The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”

Read more

14% planned production increase per month

March manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.

Read more

+£28m of M&E services for defence organisation

March provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)

Read more

Asset care maintenance for global chemical manufacturer

March undertake significant 24 hour asset care for their client, a leading multi billion pound manufacturing company.

Read more

MEP for a global aerospace company

March was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.

Read more