Expertise
March has been trusted by key UK industries for decades. We understand the challenges that business faces in terms of productivity, competition, cost control, safety, security and compliance.
March has been trusted by key UK industries for decades. We understand the challenges that business faces in terms of productivity, competition, cost control, safety, security and compliance.
We operate at the heart of the UK’s critical industries, maintaining and enhancing your infrastructure, processes and control systems. Our people are always advancing, always optimising and always ensuring compliance.
March provide specialist services including MEP design and build across numerous projects
March was appointed to complete numerous projects for this government defence department including ESH and SESH Replacement for Munitions, design of a 15,000-metre mains cable replacement, refurbishment of a high-temperature hot water boiler house and replacing part of the high-temperature hot water district heating main.
March’s skilled team approached multiple projects with their specialist teams.
On the ESH and SESH Replacement for Munition buildings, Parker undertook:
•Supply and installation of lighting
•External switchgear
•Complete testing and certification
On the 36-month mains cable replacement services provided included
•Cable design and installation
•Feeder pillars
•Link panels
•Internal switchgear
•Complete testing and certification
On the Boiler / BMS Recommission services included:
Replacement of 2 x HTHW Pumps and 2 x LTHW Pumps
•Replacement of Pumps for High and Low Temp pressure units
•Replacement of the reverse osmosis plant and LTHW softener
– A five-yearly electrical test of the building, replacing various light fittings
On the high-temperature hot water district heating main, services included:
•Replacement of district main 4’’ pipework
•Replacement of Bypass pit and balancing valve into building 84
•Replacement of original duct covers
Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.
Read moreWhen our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.
Read moreMarch has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.
Read more“The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”
Read moreMarch manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.
Read moreMarch provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)
Read moreMarch was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.
Read moreMarch provide specialist services including MEP design and build across numerous projects
Read moreMarch’s customer is a large Recycling Energy Recovery Facility in North London. The facility manages around a quarter of all the rubbish and recycling in London.
Read moreMarch were tasked with providing condition based monitoring on their client, a global supplier of food and beverage ingredients, recirculation pumps.
Read moreMarch undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.
Read moreA London Based Science Museum were experiencing efficiency issues with two aged compressors located in separate plant rooms within the site. Upon the breakdown of the GA50 compressor rendering it beyond economical repair, Motivair (a March company) was tasked with providing a quote to replace with a 50Kw replacement.
Read moreWe use cookies to optimise our website and our service, view our Cookies Policy for more information.