March provide specialist services including MEP design and build across numerous projects
March was appointed to complete numerous projects for this government defence department including ESH and SESH Replacement for Munitions, design of a 15,000-metre mains cable replacement, refurbishment of a high-temperature hot water boiler house and replacing part of the high-temperature hot water district heating main.
March’s skilled team approached multiple projects with their specialist teams.
On the ESH and SESH Replacement for Munition buildings, Parker undertook:
•Supply and installation of lighting
•External switchgear
•Complete testing and certification
On the 36-month mains cable replacement services provided included
•Cable design and installation
•Feeder pillars
•Link panels
•Internal switchgear
•Complete testing and certification
On the Boiler / BMS Recommission services included:
Replacement of 2 x HTHW Pumps and 2 x LTHW Pumps
•Replacement of Pumps for High and Low Temp pressure units
•Replacement of the reverse osmosis plant and LTHW softener
– A five-yearly electrical test of the building, replacing various light fittings
On the high-temperature hot water district heating main, services included:
•Replacement of district main 4’’ pipework
•Replacement of Bypass pit and balancing valve into building 84
•Replacement of original duct covers