Reliability improvement saving £425,000

March undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.

History

The steel belt is one of the client’s most critical assets. It transports raw material into storage at a rate of around 400 tonnes per hour. After a critical failure in 2016, failure data analysis showed that the belt had a mean time between failure of 9 months.

Solution

March undertook a reliability improvement project on the steel belt to rectify the failures.

Analysis indicated that the common failure mode was a joint failure, which at the time was a riveted joint. After consultation with the manufacturer, March implemented a welded joint to improve the reliability of this common failure mode. The analysis also indicated that the belt was subject to persistent tracking issues. To rectify this the March team designed tracking rollers which pivot when the belt tracks over.

A change in the roller position is initiated by an elasto-mounted tracking roller on the frame, manufacturing the roller from brass ensured that the roller would be the wearable part as opposed to the belt’s edge. In addition the team added spring mounted brass rollers which would constantly apply light pressure to the belts edge to align it centrally.

The redesign meant March had to re-assess the current maintenance regime, which led to the implementation of on-condition tasks for the new rollers and an NDT test on the welded steel joint.

Results

The steel belt is still in use today which means an improvement in reliability from 9 months to a minimum of 4 years.

The cost of a new belt was £80,000, making the cost saving for the client roughly £425,000.

Contact MARCH

    Full name

    Company

    Email

    Message

    Case Studies

    Asset engineering services for the UK’s best loved cereal brands

    Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.

    Read more

    Cloud Technology Deployment for a Major Utilities Company

    When our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.

    Read more

    Systems Integration & Automation for leading food and beverage manufacturer

    March has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.

    Read more

    Hybrid facilities management for global food brand

    “The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”

    Read more

    14% planned production increase per month

    March manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.

    Read more

    +£28m of M&E services for defence organisation

    March provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)

    Read more

    MEP for a global aerospace company

    March was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.

    Read more

    Specialist services for a Government defence organisation

    March provide specialist services including MEP design and build across numerous projects

    Read more

    £500,000 PV System Design & Install for the greenest EcoPark in London

    March’s customer is a large Recycling Energy Recovery Facility in North London. The facility manages around a quarter of all the rubbish and recycling in London. 

    Read more

    Condition based monitoring saves £30,000

    March were tasked with providing condition based monitoring on their client, a global supplier of food and beverage ingredients, recirculation pumps.

    Read more

    Reliability improvement saving £425,000

    March undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.

    Read more

    Energy efficiency and carbon savings of 13.67 tonnes

    A London Based Science Museum were experiencing efficiency issues with two aged compressors located in separate plant rooms within the site. Upon the breakdown of the GA50 compressor rendering it beyond economical repair, Motivair (a March company) was tasked with providing a quote to replace with a 50Kw replacement.

    Read more