Machine maintenance results in £380,000 saving

MARCH was appointed to develop a new HMI screen to enable fault finding and to reduce downtime hours for a client’s existing systems

History

Limitations to the client’s existing systems made it difficult to restart the plant after a wash sequence. This caused 175 hours of downtime in the last year. Musk was asked to develop a new HMI screen to assist with fault finding.

Solution

MARCH’s on-site engineers developed a new HMI screen to assist with fault finding. This new system provides information on valve positions, making fault finding easy.

Results

The HMI screen has dramatically reduced downtime for the client and resulted in a saving of 175 hours and £380,000 per annum across six lines for the client. The client has awarded the MARCH engineers involved in the upgrade to acknowledge and thank them for their role in achieving cost and time savings.

Case Studies

Asset engineering services for the UK’s best loved cereal brands

Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.

Read more

Cloud Technology Deployment for a Major Utilities Company

When our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.

Read more

Systems Integration & Automation for leading food and beverage manufacturer

March has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.

Read more

Hybrid facilities management for global food brand

“The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”

Read more

14% planned production increase per month

March manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.

Read more

+£28m of M&E services for defence organisation

March provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)

Read more

MEP for a global aerospace company

March was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.

Read more

Specialist services for a Government defence organisation

March provide specialist services including MEP design and build across numerous projects

Read more

£500,000 PV System Design & Install for the greenest EcoPark in London

March’s customer is a large Recycling Energy Recovery Facility in North London. The facility manages around a quarter of all the rubbish and recycling in London. 

Read more

Condition based monitoring saves £30,000

March were tasked with providing condition based monitoring on their client, a global supplier of food and beverage ingredients, recirculation pumps.

Read more

Reliability improvement saving £425,000

March undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.

Read more

Energy efficiency and carbon savings of 13.67 tonnes

A London Based Science Museum were experiencing efficiency issues with two aged compressors located in separate plant rooms within the site. Upon the breakdown of the GA50 compressor rendering it beyond economical repair, Motivair (a March company) was tasked with providing a quote to replace with a 50Kw replacement.

Read more