Transformer Replacement in a City Office Building

Outcome

A leading commercial property operator now benefits from a modern transformer installation that supports the continued reliability of its electrical distribution infrastructure. The project ensured operational continuity throughout the works while safely replacing ageing equipment within a live City of London commercial building.

Case Study
Download

Challenge

  • Replace transformer in live building
  • Restricted access within occupied property
  • Confined working environment
  • Complex lifting and installation requirements
  • Maintain uninterrupted building operations

Solution

  • Removed cast resin transformer
  • Installed new transformer system
  • Integrated existing HV RMU infrastructure
  • Reconfigured existing LV busbars
  • Commissioned and energised new installation

Results

  • Transformer safely replaced
  • Zero safety incidents recorded
  • No unplanned operational disruption
  • Building power successfully reinstated
  • Completed within outage window

Services

  • Transformer Installation & Replacement
  • High Voltage Engineering
  • LV & HV Infrastructure
  • Testing & Commissioning
  • Project Management

Contact MARCH

    Full name

    Company

    Email

    Message

    Case Studies

    Asset engineering services for the UK’s best loved cereal brands

    Our client is one of the the biggest breakfast cereal and snack producers in the world. For over 40 years, March has provided a range of services to ensure that plants continue to run efficiently including steel and pipework manufacture, mechanical and electrical engineering, systems integration and supporting industry 4.0.

    Read more

    Cloud Technology Deployment for a Major Utilities Company

    When our major water utility client wanted to optimise plant operations and minimise energy consumption it turned to March to support an innovative cloud technology deployment initiative driven by the performance excellence team.

    Read more

    Systems Integration & Automation for leading food and beverage manufacturer

    March has been providing our client, the largest food and beverage company in North America and the second-largest in the world, with Systems Integration and Automation turnkey projects for over 15 years.

    Read more

    Hybrid facilities management for global food brand

    “The health, safety and welfare of our team is more important than all the product in the world! March put health, safety and welfare first in everything they do. An outstanding safety performance from an outstanding company. Well done, March.”

    Read more

    14% planned production increase per month

    March manufacture, install and then integrate all process services for fermentation process at agricultural product production plant.

    Read more

    +£28m of M&E services for defence organisation

    March provide specialist services across five sites for a UK Defence Infrastructure Organisation (DIO)

    Read more

    MEP for a global aerospace company

    March was appointed to provide mechanical, electrical and plumbing engineering projects for a multinational aerospace company.

    Read more

    Specialist services for a Government defence organisation

    March provide specialist services including MEP design and build across numerous projects

    Read more

    £500,000 PV System Design & Install for the greenest EcoPark in London

    March’s customer is a large Recycling Energy Recovery Facility in North London. The facility manages around a quarter of all the rubbish and recycling in London. 

    Read more

    Condition based monitoring saves £30,000

    March were tasked with providing condition based monitoring on their client, a global supplier of food and beverage ingredients, recirculation pumps.

    Read more

    Reliability improvement saving £425,000

    March undertook a reliability improvement project resulting in significant client savings and improvement to the reliability of their critical assets.

    Read more

    Energy efficiency and carbon savings of 13.67 tonnes

    A London Based Science Museum were experiencing efficiency issues with two aged compressors located in separate plant rooms within the site. Upon the breakdown of the GA50 compressor rendering it beyond economical repair, Motivair (a March company) was tasked with providing a quote to replace with a 50Kw replacement.

    Read more